Capital Renewal Forecast
Year-1 Operating Cost Composition
Data Quality
Top Classes by Replacement Value
Annual & Cumulative Renewal Expenditure
Scenario Comparison
Annual Renewal Totals, Year by Year
Renewal Summary by Asset Class
Planned Renewal Spend by Year
Renewal Work Items
Operating Cost Projection
Operating Guardrail
Breakdown by Category
Breakdown by Cost Logic / Delivery / Nature
Asset-Driven Maintenance (generated from your asset list)
Facility Operating Lines (area- and staffing-driven)
Maintenance: Actuals vs Projection
Uniformat II Coverage
Reconciliation
Open Items & Assumption Log
Methodology & Standards
Asset Register
Reference & Assumptions Library
Project Information
Data Management
Buildings & Campus
First time here? Start with this guide.
What this analyzer is, how to get your data in, what every term means, and how the numbers are produced. Replay the interactive walkthrough any time.
What is this?
1. An asset list — an Excel or CSV register of the equipment in your building (or type assets in manually).
2. Project basics — gross floor area, a construction cost estimate, completion year and building type.
3. Nothing else. Cost, service life and maintenance assumptions come from the built-in reference library of ~100 building system classes, every value of which you can override.
It returns a 30–60 year capital renewal forecast with NPV, an annual operating cost estimate (asset-driven maintenance plus area-driven facility services), scenario analysis, a guardrail check against construction cost, and a coverage report showing exactly what your asset list does and does not represent.
New in v3: the Renewal Planner turns that forecast into a live multi-year plan (statuses, priorities, quotes, year moves), one project can hold a whole campus of buildings, asset age times first renewals for existing facilities, and maintenance actuals track against projections.
Everything runs locally in your browser. No data is uploaded anywhere.
Getting your data in
- Create a project.
Name, building type, gross floor area, construction cost estimate, completion year. Floor area auto-seeds the facility operating lines; construction cost activates the guardrail.
- Import your asset list.
Any Excel or CSV layout works. The wizard detects your header row, lets you map columns (only Description is required), and shows a preview before anything is committed. A clean template is downloadable if you prefer to start from one.
- Let classification run.
Assets match to library classes by OmniClass/Uniformat code first, then by description keywords ("AHU", "air handler" and "rooftop unit" all find Air Handling Units). Whatever remains lands in a review list for manual assignment — individually or in bulk.
- Review and refine.
Check the dashboard, edit library values you have better data for, adjust facility lines, switch scenarios. Everything recalculates instantly and saves automatically.
- Export.
Project file (.json) for backup and sharing; CSV of the renewal forecast and class summaries for reports.